Specifications
- Install all components, as per drawings, specifications and to the requirements of local building codes, and plumbing codes.
- All material to be C.S.A. approved.
- Supply own tools and equipment necessary to complete all work.
- Arrange necessary inspections. Layout locations of fixtures, taps and drains on site with owner.
- Arrange and co-ordinate delivery of all materials.
- Arrange for service layout and connect service with local utility.
- Repair any damage incurred from installations.
- Install separate shut offs to all locations for both hot and cold potable water supply.
- Obtain and pay for required permits.
Supply
Install
Inspected
______
______
_____
All rough in of water and drain pipes.
______
______
_____
Kitchen sink and taps.
______
______
_____
Garbarator.
______
______
_____
Dishwasher.
______
______
_____
Refrigerator ice maker water line.
______
______
_____
Bathroom sinks and taps.
______
______
_____
Toilets and seats.
______
______
_____
Bathtubs and taps.
______
______
_____
Bidets and taps.
______
______
_____
Showers and taps.
______
______
_____
Spa.
______
______
_____
Laundry tubs and taps.
______
______
_____
Washing machine drain and taps.
______
______
_____
Exterior hosebibs.
______
______
_____
Plumbing traps.
______
______
_____
Sump pumps.
______
______
_____
Well pump.
______
______
_____
Sewage and/or greywater pump.
______
______
_____
Municipal sewer and water connections.
______
______
_____
Septic and well connections.
______
______
_____
Stack gasket on roof.
______
______
_____
Trench for service connection’s.
______
______
_____
Backfill for trench.
______
______
_____
Water softener.
______
______
_____
Water purification system, of type;
_______________________
______
______
_____
Hot water heater, of type and size;
_______________________
Hot water heater to be rented _______, or Purchased _______________, for $_______.__
Plumbing fixture allowance; $_______________________________.______
Tap allowance; $_______________________________.______
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
Contractors on site time to be: _______________________________________________
Service and rough in:_______________________________________________
Connect and finish:_______________________________________________