Specifications

  • Install all components, as per drawings, specifications and to the requirements of local building codes, and plumbing codes.
  • All material to be C.S.A. approved.
  • Supply own tools and equipment necessary to complete all work.
  • Arrange necessary inspections. Layout locations of fixtures, taps and drains on site with owner.
  • Arrange and co-ordinate delivery of all materials.
  • Arrange for service layout and connect service with local utility.
  • Repair any damage incurred from installations.
  • Install separate shut offs to all locations for both hot and cold potable water supply.
  • Obtain and pay for required permits.

Supply

Install

Inspected
______
______
_____
All rough in of water and drain pipes.
______
______
_____
Kitchen sink and taps.
______
______
_____
Garbarator.
______
______
_____
Dishwasher.
______
______
_____
Refrigerator ice maker water line.
______
______
_____
Bathroom sinks and taps.
______
______
_____
Toilets and seats.
______
______
_____
Bathtubs and taps.
______
______
_____
Bidets and taps.
______
______
_____
Showers and taps.
______
______
_____
Spa.
______
______
_____
Laundry tubs and taps.
______
______
_____
Washing machine drain and taps.
______
______
_____
Exterior hosebibs.
______
______
_____
Plumbing traps.
______
______
_____
Sump pumps.
______
______
_____
Well pump.
______
______
_____
Sewage and/or greywater pump.
______
______
_____
Municipal sewer and water connections.
______
______
_____
Septic and well connections.
______
______
_____
Stack gasket on roof.
______
______
_____
Trench for service connection’s.
______
______
_____
Backfill for trench.
______
______
_____
Water softener.
______
______
_____
Water purification system, of type;
_______________________
______
______
_____

Hot water heater, of type and size;
_______________________

Hot water heater to be rented _______, or Purchased _______________, for $_______.__

Plumbing fixture allowance; $_______________________________.______

Tap allowance; $_______________________________.______

$______________.____ for _____________________________________

$______________.____ for _____________________________________

Sub total: $____________________._____

G.S.T.: $____________________._____

P.S.T: $____________________._____

TOTAL: $____________________._____

Obligations of owner to contractor:

Site preparation___________________________________________

Other___________________________________________________

Lead time required ________________________________________

Terms of payment:

Hold back of 10% for 30 days upon completion ($___________.____)

Contractors on site time to be: _______________________________________________

Service and rough in:_______________________________________________

Connect and finish:_______________________________________________